Work is underway on a project to repair
deteriorating concrete sections of the
Hood
River
Bridge
on Interstate 84.
The work will require shifting I-84 eastbound
traffic into I-84 westbound travel lanes. The traffic shift
gives the contractor full access to the I-84 eastbound bridge
deck.
The traffic shift will remain in place 24
hours a day until the project is complete at the end of
November. During the traffic shift, one lane will remain open on
I-84 in each direction.
To prevent motorists from entering the work
zone, the contractor will close the Second Street on-ramp to
I-84 eastbound for 10 days through Nov. 12.
Motorists should watch for large equipment
and workers on the roadway.
ODOT is also doing work on I-84 at Cascade
Locks interchange (milepost 44): Eastbound traffic has shifted
to a new alignment over U.S. 30 (WaNaPa Street).
Expect daytime single-lane closures on I-84.
Expect daytime one-way traffic controlled by flaggers on the
roadway connecting U.S. 30 to S.E. Frontage Road (beneath I-84).
Watch for roadside crews and construction equipment and
construction vehicles exiting and entering the westbound travel
lanes of I-84.
Also, expect daytime single-lane closures in
each direction on I-84 over Herman Creek and Wyeth Roads
(milepost 47).
|