0

Beach work

  
AN EXCAVATOR operated by John Mann, Port of Hood River facilities manager, unearths a boulder at Event Site on the Hood River Waterfront, to assemble a new rock wall.

Photo by Patrick Mulvihill
AN EXCAVATOR operated by John Mann, Port of Hood River facilities manager, unearths a boulder at Event Site on the Hood River Waterfront, to assemble a new rock wall.

AN EXCAVATOR operated by John Mann, Port of Hood River facilities manager, unearths a boulder at Event Site on the Hood River Waterfront, to assemble a new rock wall. The port has closed access at the Event Site beach until Friday, Nov. 3. Port crews are rehabilitating the beach, and heavy machinery and other hazards will be present throughout the closure. Crews were set to bring in 300 cubic yards of new washed stone material to replenish the beach slope, and place rocks along the grass edge to help mitigate erosion and improve the slope for recreational access and safety.



Comments

Comments are subject to moderator review and may not appear immediately on the site. A user's first several comments must be manually approved by a moderator.

Please read our commenting policy before posting.

Use the comment form below to begin a discussion about this content.

Sign in to comment

CLOSE X

Information from the News and our advertisers (Want to add your business to this to this feed?)