Photo detail

Worker hand-digs to clear the stormwater line for connection to the new catch basin in front of the library.

Stories this photo appears in:

Tease photo

Kaleidoscope: Working ahead of schedule on State

Four months to go on major Urban Renewal project for downtown Hood River

Crestline’s Jake Hamilton sat in the excavator with its toothed-bucket the size of a small dorm fridge and nudged a 10-inch trowel off a concrete box he needed to pick up.

Comments

Comments are subject to moderator review and may not appear immediately on the site. A user's first several comments must be manually approved by a moderator.

Please read our commenting policy before posting.

Use the comment form below to begin a discussion about this content.

Sign in to comment